OpinionReady

Buying sample

The cost of a complete, decomposed

A CPI is four numbers wearing one coat, and which of the four is moving tells you whether the price is negotiable.

Two colleagues working through a pricing sheet at a shared terminal

Outline. Each heading below carries one line saying what the section has to establish. Expand each into two to four paragraphs, put at least one number or worked example in the piece that nobody else could publish, then delete this note.

A cost per interview gets negotiated as though it were one number. It is at least four, and three of them are fixed by the brief rather than by the supplier.

The four components

Respondent reward, screen-out load, panel maintenance and acquisition, margin. Give the rough shape of each.

Incidence sets the screen-out load, and the brief sets incidence

Show why a low-IR study is expensive for a reason that has nothing to do with the supplier.

The component that gives when you push

Usually reward or margin. Say what happens to the data when it is the first one.

Length of interview is priced badly almost everywhere

Per-complete pricing against the hourly rate the respondent experiences. Link the hourly-rate piece.

What a quote should itemise

The itemisation a buyer should be able to ask for, and why most quotes do not carry it.

Where we will not compete

The floor below which the reward stops being defensible, and what we say instead of quoting it.

Filed under Buying sample

Who wrote this

OpinionReady Method Desk — Panel operations and data quality

The people who run the exchange day to day — supply operations, quality review and the payout queue. These notes come out of work we had to do anyway, written down because the same questions keep arriving from buyers and from members.

Written from our own operating record: the screening calls, field estimates and payout runs described here are ones we make on this exchange, not secondhand summaries of research done elsewhere.

More on buying sample

Everything on this topic
  • What a Partner Audit Changed

    A supply partner walked the participant entry end to end before opening volume. Three of the things they asked for were things we had been meaning to do.

    4 min read
  • Reading a sample supplier’s quality report

    Most quality reports are written to survive being read, not to be used. A handful of questions separate the ones with measurement behind them.

    4 min read
  • Three hops and the loss of provenance

    Sample rarely travels in a straight line. Each time it changes hands something specific is lost, and by the third hand nobody can tell you where a respondent came from.

    4 min read